TB 1--1520--237--20--217
a. Parts Required. Items cited in paragraph 6 may be required to replace defective items.
b. Requisitioning Instructions. Contact Logistical point of contact in paragraph 16b prior to requisition-
ing replacement parts.
c.
Bulk and Consumable Materials. N/A.
d. Disposition. Hold any discrepant part/component pending disposition instructions from Logistical
e. Disposition of Hazardous Material. IAW Environmental Protective Agency Directives as implement-
ed by your servicing environmental coordination (AR 200--1).
11. Special Tools, Jigs and Fixtures Required. N/A.
12. Application.
a. Category of Maintenance. AVUM. Aircraft downtime will be charged to AVUM.
b. Estimated Time Required.
(1) Total of 1 man--hours using 1 person.
(2) Total of 2 hours downtime for one end item inspection. Estimated time of 4 hours downtime
for replacement.
c.
Estimated Cost Impact to the Field.
NOMENCLATURE
PART NUMBER
NATIONAL STOCK NUMBER
COST EACH
Primary Servo Assembly
70410--02820--054
1650--01--143--1226
,293.00
Total cost per aircraft = ,293.00
d. TB/MWOs to be Applied Prior to or Concurrently with this Inspection. N/A.
e. Publications Which Require Change as a Result of This Inspection. N/A.
13. References.
a. TM 1--1520--250--23
b. TM 1--1520--237--23
14. Recording and Reporting Requirements.
a. Reporting compliance Suspense Date (Aircraft). Upon entering requirements of this TB on DA Form
2408-13-1 on all subject MDS aircraft, forward a priority message, datafax or e--mail to Commander, AM-
COM, ATTN: AMSAM--SF--A (SOF Compliance Officer), Redstone Arsenal, AL 35898--5000, IAW AR 95--1.
Datafax number is DSN 897--2111 or commercial (256) 313--2111. E-Mail address is "SAFEADM@REDS-
TONE.ARMY.MIL". The report will cite this TB number, date of entry in DA Form 2408-13-1, the aircraft mis-
sion design series and serial numbers of aircraft in numerical order.
b. Task/Inspection reporting suspense date (Aircraft) -- Upon completion of inspection, units will for-
ward a priority message to the Logistical POC listed in paragraph 16b. The report will cite this TB number,
date of inspection, aircraft and component serial number, aircraft and component hours, and results of the
inspection. Inspection reports will be completed no later than 15 days after task/inspection suspense date.
c.
Reporting Message Receipt (Spares). N/A.
d. Task/Inspection Reporting Suspense Date (Spares).
(1) Materiel In Wholesale Depot Storage. Report compliance with this TB to the wholesale mate-
riel POC (SPARES) listed in paragraphs 16c within 7 days of the date of this TB on DD Form 1225. Provide
the cost of compliance with this TB to include an estimate of the cost reimbursable funding required to move
3