TB 1-1520-238-20-68
10. Supply/Parts and Disposition.
a. Parts Required. Items cited in paragraph 6 and 7 may be required to replace defective items.
b. Requisitioning Instructions. Requisition replacement parts through normal supply channels using normal supply
procedures. All requisitions shall use project code " BK"per this TB.
X
NOTE
Project code " BK"is required to track and establish a data base of stock fund expenditures
X
incurred by the field as a result of ASAM/SOF actions.
c. Bulk and Consumable Materials.
NOMENCLATURE
PART NUMBER
NATIONAL STOCK NUMBER
Hose Clamp
M85052/1-7
d. Disposition. Dispose of removed parts/components in accordance with normal supply procedures. A QDR is
required.
e. Disposition of Hazardous Material. N/A.
11. Special Tools, Jigs and Fixtures Required. NVA.
12. Application.
a. Category of Maintenance. AVUM. Aircraft downtime will be charged to AVUM Maintenance.
b. Time Required.
(1) Total of 2 man-hours using 1 person.
(2) Total of 2 hours downtime for one end item.
c. Estimated Cost Impact of Stock Fund Items to the field.
NOMENCLATURE
PART NUMBER/
QUANTITY
COST EACH
TOTAL $
NATIONAL STOCK NUMBER
Hose Clamp
M85052/1-7
1
$ .95
$ .95
Hydraulic Hose
7-311830102-5
1
$ 174.82
$ 174.82
Maximum total cost per aircraft = $ 175.77
d. TB/MWOs to be Applied Prior to or Concurrently with this Inspection. N/A.
e. Publications Which Require Change as a Result of This Inspection. TM 1-1520-238-23P shall be changed to
reflect this TB. A copy of this TB shall be inserted in the appropriate TM as authority to implement the change until the
printed change is received.
13. References.
a TM 1-1520-238-23, Aviation Unit and Intermediate Maintenance Manual, Army Model AH-64A Helicopter, dated 16
May 94.
b. TM 1-1520-238-23P, Repair Parts and Special Tools List, dated 28 April 1995.
3