TB 1-1520-240-20-103
NOTE
Project code "XDW, "X-RAY-DELTA-WHISKEY" is required to track and establish
a database of stock fund expenditures incurred by the field as a result of SOF actions.
c.
Bulk and Consumable Materials. N/A.
d. Disposition. N/A.
e. Disposition of Hazardous Material. In accordance with Environmental Protection Agency directives
as implemented by your Servicing Environmental Coordinator (AR 200-1).
11. Special Tools, Jigs and Fixtures Required.
a.
Servo Cylinder Safety Blocks.
b.
Pitch Link Lock Pins.
12. Application.
a.
Category of Maintenance. AVUM. Aircraft downtime will be charged to AVUM.
b. Estimated Time Required.
(1) For Inspection.
(a) Total of .25 man-hours using one person.
(b) Total of .25 hours downtime for one end item.
(2) For Replacement.
(a) Total of 6 man-hours using three people.
(b) Total of 2 hours downtime for one end item.
c . Estimated Cost Impact of Stock Fund Items to the Field.
NOMENCLATURE
PART NUMBER/
TOTAL $
QUANTlTY COST EACH
NATIONAL STOCK NUMBER
Bolt
145R3650-1
2.00
3.00
2
Bushing
114R3116-54
$ 10.26
.13
2
3120-01-066-5380
Bushing
145R3116-2
$ 13.88
$ 6.94
2
3120-01-129-7649
Cotter Pin
MS24665-374
$ 6.66
$ 3.33
2
AN320-10
Nut
$ 49.54
$ 24.77
2
Washer
AN960-1016
$ 69.00
$ 3.45
2
5310-00-167-0625
Maximum total cost per aircraft = 1.34
d.
TB/MWOs to be Applied Prior to or Concurrently with this Inspection. N/A.
e. Publications Which Require Change as a Result of This Inspection. TM 55-1520-240-23P and
TM 1-1520-252-23P shall be changed to better differentiate forward and aft controls installation.
3