TB 1-1520-240-20-84
NOTE
Project code "XCC" is required to track and establish a data base of stock fund expenditures incurred by the field
as a result of this TB.
c. Bulk and Consumable Materials - Inspect all P/N 114R3650-3 bolts for Accurate Tool Co.
d. Disposition - Mutilate any bolt assembly that does not meet inspection criteria in accordance with TM 1-1500-
328-23.
e. Disposition of Hazardous Materiel - N/A.
11.
Special Tools, Jigs and Fixtures Required - N/A.
12.
Application -
a. Category of Maintenance - AVUM Aircraft downtime will be charged to AVUM.
b. Estimated Time Required -
(1) Total of one man-hour using one person.
(2) Total of one hour downtime for one end item.
c. Estimated cost impact of stock fund items to the field - .69
PART NUMBER/
NOMENCLATURE
NATIONAL STOCK NUMBER
QTY
COST EACH
BOLT ASSY - ROTARY
4
.69
WING HEAD CONTROL
Total Cost Per Aircraft = 8.76
d. TB/MWOs to be Applied Prior to or Concurrently With This Inspection - N/A.
e. Publications Which Require Change as a Result of This Inspection - N/A.
13.
References -
a. TM 1-1500-328-23
b. TM 55-1520-240-23
c. TM 1-1520-252-23
d. TM 55-1520-240-23P
14.
Recording and Reporting Requirements -
a. Reporting Compliance Suspense Date (Aircraft) - Upon entering requirements of this TB on DA Form 2408-13-1
on all subject MDS aircraft, forward a priority message, datafax or E-Mail to Commander, ATCOM, ATTN: AMSAT-R-X
(SOF Compliance Officer), per AR 95-3. Datafax number is DSN 693-2064 or commercial (314) 263-2064. E-Mail
address is "amsatrxs@st-louis-emh4.army.mil". The report will cite this TB number, date of entry in DA Form 2408-13-1,
the aircraft mission design series and serial numbers of air- craft In numerical order.
b. Task/Inspection Reporting Suspense Date (Aircraft) - Upon completion of inspection, units will forward a priority
message to: Commander, ATCOM, ATTN. AMCPM-CH, the logistical point of contact listed below. The report will cite
this TB, date of Inspection, aircraft serial number, aircraft and component hours, and results of the inspection. Inspection
and reports will be completed no later than 10 days after Task/Inspection Suspense Date.
c. Reporting Compliance Suspense Date (Spares) -
(1) Materiel in Wholesale Depot Storage. Report receipt of this TB to the wholesale materiel (spares) point of
contact listed in paragraph 16c within 3 working days from the date of this TB.
3