TB 1-1520-240-20-102
NOTE
The data plate on the transmission must be checked to verify correct serial
number. Aircraft record checks alone are not sufficient and will not be used.
b. Once corrected by depot maintenance, these serial numbered transmissions will be identified with a "BG" on the
overhaul metal CAL/data plate. Also DA Forms 2410 reflecting a overhaul date of 8 December 1997 will indicate the
transmission shimming problem has been corrected.
9. Correction Procedures. Contact the logistical point of
contact listed in
paragraph 16b in
accordance with paragraph
14b. Negative reports are required.
10. Supply/Parts and Disposition.
a. Parts Required. Items cited in paragraph 6 may be required to replace defective items.
b. Requisitioning Instructions. Contact logistical point of contact in paragraph 16b for requisitioning instructions. All
requisitions shall use project code (cc 57-59) 'XDZ", 'X-RAY-DELTA-ZULU."
NOTE
Project code XDZ", "X-RAY-DELTA-ZULU" is required to track and establish a
database of stock fund expenditures incurred by the field as a result of SOF
actions.
c. Bulk and Consumable Materials. N/A.
d. Disposition. Hold in stock, or if installed, c ntinue using on aircraft any discrepant part/component pending
o
disposition instructions from the logistical point of contact in paragraph 16b.
e. Disposition of Hazardous Material. N/A.
11. Special Tools, Jigs, and Fixtures Required. N/A.
12. Application.
a. Category of Maintenance. AVUM.
b. Estimated Time Required.
(1) Total of .5 man-hours using one person.
(2) No downtown required.
c. Estimated Cost Impact of Stock Fund Items to the Field. N/A.
d. TB/MWOs to be Applied with This Inspection. N/A.
e. Publications Which Require Change as a Result of This Inspection. N/A.
13. References. Message, PEOAVN, 8 Jan 98, Subject: Search for CH-47 Aft Transmissions, CH-47 PM Memo 98-01.
14. Recording and Reporting Requirements.
a. Reporting Compliance Suspense Date (Aircraft). Upon entering requirements of this TB on DA Form 2408-13-1
on all subject MDS aircraft, forward a priority message, datafax, or e-mail to Commander, AMCOM, ATTN: AMSAM-SF-A
(SOF Compliance Officer), Redstone Arsenal, AL 35898-5222 in accordance with AR 95-1. Datafax number is DSN 897-
2111 or (256) 313-2111. E-mail address is "safeadm@redstone.army.mil'. The report will cite this TB number, date of
entry in DA Form 2408-13-1, the aircraft mission design series, and serial numbers of aircraft in numerical order.
b. Task/inspection Reporting Suspense Date (Aircraft). Upon completion of inspection, units will forward a priority
message to the logistical POC in paragraph 16b. The report will cite this TB number, date of inspection, aircraft serial
number, suspect transmission serial number, TSO of suspect transmission, along with local POC and telephone number.
Inspection and reports will be completed no later than five days after the task/inspection suspense date. A negative report
is required.
3