TB 1-1520-240-20-96
Correction Procedures.
9.
a.
Requisition replacement P/N 4C3074, revision D, check valves.
b. Install check valves in accordance with the instructions in TM 55-1520-240-23-6, Task 7-54.2 or
TM 1-1520-252-23-7, Task 7-67.
Report compliance with the above in accordance with paragraph 14b below.
C.
10. Supply/Parts and Disposition.
a.
Parts Required. Items cited in paragraph 7 above may be required to comply with this TB.
b. Requisition Instructions. Requisition replacement parts through normal supply channels using
normal supply procedures. All requisitions shall use project code "XDC" per this TB.
NOTE
Project code "XDC" is required to track and establish a data base of stock fund expenditures
incurred by the field as a result of TB actions.
c. Bulk and Consumable Materials. N/A.
d.
Disposition. Mutilate in accordance with TM 1-1500-328-23.
e.
Disposition of Hazardous Material. N/A.
11. Special Tools, Jigs and Fixtures Required. N/A.
12. Application.
a.
Category of Maintenance. AVIM. Aircraft downtime will be charged to AVIM.
b. Time Required.
(1) Inspection: 1 man-hour using 1 person.
(2) Replacement: 6 man-hours using 2 persons.
(3) Total of 3 hours downtime for one end item.
c. Estimated Cost Impact of Stock Fund Items to the Field. One hundred twenty-three dollar and five
d. TB/MWOs to be Applied Prior to or Concurrently with this Inspection. N/A.
e.
Publications Which Require Change as a Result of This Inspection. N/A.
13. References.
a. TM 55-1520-240-23-6.
b. TM 55-1520-240-23P-2.
c. TM 1-1520-252-23-7.
d. TM 1-1520-252-23P-2.
14. Recording and Reporting Requirements.
a. Reporting Compliance Suspense Date (Aircraft). Upon entering requirements of this TB on DA Form
2408-13-1 on all subject MDS aircraft, forward a priority message, datafax or E-Mail to Commander, ATCOM,
ATTN: AMSAT-R-X (SOF Compliance Officer), per AR 95-3. Datafax number is DSN 693-2064 or commer-
cial (314) 263-2064. E-Mail address is "AMSATRXS@EMH4.STL-.ARMY.MIL". The report will cite this TB
number, date of entry in DA Form 2408-13-1, the aircraft mission design series and serial numbers of aircraft
in numerical order.
b. Task/Inspection Reporting Suspense Date (Aircraft). Inspection and reports will be completed no
later than 7 days after task/inspection suspense date. Units have 90 days from time suspect check valves
are located on aircraft to replace them. This allows order, ship and replacement time.
4