b. Requisitioning Instructions. Requisition replacement parts using normal supply procedures. All
requisitions shall use project code "CC 57-59" "XFJ".
NOTE
Project code "XFJ" is required to track and establish a data base of stock fund expenditures
incurred by the field as a result of ASAM actions.
c.
Bulk and Consumable Materials.
NOMENCLATURE
PART NUMBER
FED SPEC Q-A-51 (OR EQUIV)
Acetone
FED-SPEC P-D-680 (OR EQUIV)
Dry Clean Solvent
Epoxy Paint Remover
d. Disposition. Document the failure through the category 1 deficiency reporting system and hold ex-
hibit pending disposition instructions from AMCOM.
e. Disposition of Hazardous Material. IAW Environmental protective agency directives as implemented
by your servicing environmental coordination (AR 200-1).
11. Special Tools, Jigs and Fixtures Required.
PART NUMBER
NOMENCLATURE
19ELL
Eddy Current Kit
SPCK-107A
Eddy Current Probe Kit
12. Application.
a. Category of Maintenance. AVUM/AVIM. Aircraft downtime will be charged to AVUM/AVIM. Eddy
current inspection is only authorized at AVIM level.
b. Estimated lime Required.
(1) For Eddy Current Inspection.
(a) Total of 3 man-hours using 2 persons.
(b) Total of 2 hours downtime for one end item
(2) For FPI Procedure.
(a) Total of 6 man-hours using 1 person.
(b) Total of 30 hours downtime for one end item.
(3) For Removal/Replacement.
(a) Total of 52 man-hours using 4 person.
(b) Total of 72 hours downtime for one end item.
c.
Estimated Cost Impact of Stock Fund Items to the Field.
NATIONAL STOCK NUMBER
PART NUMBER
COST EACH
NOMENCLATURE
,109.38
70103-08112-041
Hub, Rotor, Assembly
d. TB/MWOs to be Applied Prior to or Concurrently with this Inspection. N/A.