TB 1-1520-240-20-118
covering only the base of the bolt head and washer to prevent moisture
from entering horizontal hinge pin.
NOTE
Commanders will insure that all crew members are made aware of this
special interest inspection and the importance of conducting the inspec-
tion during pre and post flight inspections.
a.
Perform the following inspections.
(1) Initial Inspection. Inspect each bolt, P/N 114R2201--1, apply hand pressure to the head to as-
sure the adhesive is not holding the bolt head in place. If the bolt head is broken off the rotor head is considered
unserviceable until the inspection of paragraph 8b is completed. If it is necessary to remove excessive adhe-
sive RTV, the units have 10 flight hours but no later than 25 May 2000 to comply with proper application of
adhesive RTV in accordance with the note above.
(2) Recurring Inspections. During each daily inspection, preflight and postflight, inspect each
bolt, P/N 114R2201--1. Apply hand presure to the head to assure the adhesive is not holding the bolt head
in place. If the bolt head is broken off, the rotor head is considered unserviceable.
b. If a broken bolt head is found, inspect the following parts while the horizontal hinge pin is disas-
sembled: horizontal hinge pin, tie bar, and nut (reference 13a, figure 176, item 113, 87, and 121 respectively)
or (reference 13b, figure 5--4, item 98, 87, and 121 respectively). Inspect for scoring, deformation or any evi-
dence that parts have abnormal wear.
9.
Correction Procedures.
a. If a broken bolt head is found, replace bolt with P/N 114R2201--1 or 114R2201--2 in accordance with
Task 5--44 and Task 5--46, reference 13d or Task 5--55 and Task 5--57, reference 13e. Use adhesive (E63.1
of reference 13d or E67 of reference 13e) and apply a thin bead covering the base of the bolt head and washer.
b. Bolt P/N 114R2201--1 shall be replaced with a new bolt (either a --1 or --2) at each 1200 hour horizon-
tal hinge pin inspection (rotation or replacement) or during any unscheduled maintenance requiring horizontal
hinge pin removal or during depot overhaul.
10. Supply/Parts and Disposition.
a. Parts Required. Bolt, P/N 114R2201--1 or 114R2201--2 may be required to replace defective items
or those required to be changed in accordance with paragraph 9b above. Bolt, P/N 114R2201 will be issued
until stock is depleted or P/N 114R2201--2 bolts are available in the supply system.
b. Requisitioning Instructions. Requisition replacement parts using normal supply procedures. All req-
uisitions shall use project code (CC 57--59) "XC8" , "X--RAY--CHARLIE--EIGHT".
NOTE
Project code 'XC8" , "X--RAY--CHARLIE--EIGHT" is required to track and establish a data base
of stock fund expenditures incurred by the field as a result of Safety of Flight actions.
c. Bulk and Consumable Materials. 730 RTV,
8040--00--251--2312.
d.
Disposition.
(1) Heads. Dispose of removed parts/components using normal supply procedures. All turn--in
documents must include project code (CC 57--59) "X--RAY--CHARLIE--EIGHT".
(2) Bolts. Demilitarize/mutilate in accordance with TM 1--1500--328--23 any part/component
which does not meet inspection criteria.
(3) Tie Bars or Horizontal Hinge Pins. Hold any discrepant part/component pending disposition
instructions from technical point of contact in paragraph 16.
e. Disposition of Hazardous Material. In accordance with Environmental Protection Agency directives
as implemented by your servicing environmental coordinator (AR 200--1).
3