TB 1--1520--240--20--146
10. Supply/Parts and Disposition.
a. Parts Required. Items cited in paragraph 6 may be required to replace defective items.
b. Requisitioning Instructions. Requisition replacement parts using normal supply procedures. All req-
uisitions shall use project code (CC 57-59) "X13" (X--Ray--One--Three).
NOTE
Project Code "X13" is required to track and establish a data base
of stock fund expenditures incurred by the field as a result of message
actions.
c.
Bulk and Consumable Materials. The following materials will be required --
PART NUMBER
NATIONAL STOCK NUMBER
NOMENCLATURE
BOLT
114R2162-1
NUT, SELF--LOCKING
MS21083N4
5306-00-903-8282
BOLT
AN4H30A
SEAL
114R2142-3
5306-00-913-0933
SEAL
114RS215-1
5306-00-248-5124
d. Disposition.
(1) If cracks are found in the tie bar assembly, disposition instructions will be provided upon re-
ceipt of the Category I Deficiency Report.
(2) If tie bar failed inspection due to deformed washer, dispose of using normal supply proce-
dures.
(3) Tie bars on hand which previously failed the inspection in accordance with CH-47-02-03 for
other than cracks and/or deformed washers shall be shipped to --
SR Corpus Christi Army Depot SRA
Building 1846
Corpus Christi, TX 78419-6030
(4) If tie bar assembly TSN is equal to or more than 4800 hours, contact the technical point of
e. Disposition of Hazardous Material. N/A.
11. Special Tools and Fixtures Required. As required.
a. Category of Maintenance. AVUM. Aircraft downtime will be charged to AVUM.
b. Estimated Time Required-
(1) Time to complete the records inspection -- Total of 0.5 man-hours using 1 person.
(2) Time to complete inspection of the tie bar assembly --
(a) Total of 124 man-hours using 8 persons.
(b) Total of 20.0 hours downtime for one end item. Down time includes time required mainte-
nance test flight.
5