TB 1-1520-240-20-148
c. If last overhaul was not performed at CCAD or was performed at CCAD prior to 28 June 2000 or
after 17 June 2002, clear the red horizontal dash //--// entry.
10. Supply/Parts and Disposition.
NOTE
HQDA-ADCS-G-3 will prioritize units and repair parts distribution.
a. Parts Required. Items cited in paragraph 12c may be required to replace defective items.
b. Requisitioning Instructions. Requisition replacement parts using normal supply procedures. All req-
uisitions shall use project code (CC 57-59) "X1X" (X-RAY--ONE--X-RAY).
NOTE
Project code "X1X" is required to track and establish a database of stock fund expenditures in-
cuured by the field as a result of message actions.
c. Bulk and Consumable Materials.
PART NUMBER
NATIONAL STOCK NUMBER
NOMENCLATURE
Element, Filter, Fluid
145DS023-6
O-ring
M83248/1-134
Element, Filter, Fluid
145DS514-4
Element, Filter, Fluid
145DS514-7
O-ring
M83248/1-112
O-ring
M83248/1-116
O-ring
M83248/1-122
Gasket
145DS025-11
5330-01-115-3764
Filter, Assembly
145DS523-2
4330-01-114-0918
d. Disposition. Dispose of removed parts/components using normal supply system. All turn-in docu-
ments must include project code (CC 57-59) "X1X" (X-RAY--ONE--X-RAY).
e. Disposition of Hazardous Material. In accordance with environmental protection agency directives
as implemented by your servicing environmental coordinator (AR 200-1).
11. Special Tools and Fixtures Required. As required.
a. Category of Maintenance -- AVUM. Aircraft downtime will be charged to AVUM maintenance. Report
aircraft non-mission capable maintenance (NMCM) while undergoing inspection and correction in accor-
dance with this message.
b. Estimated Time Required.
(1) Time to complete records check -- Total of 0.5 man-hours using 1 person.
(2) Time to complete visual inspection --
(a) Total of 6 man-hours using 1 person.
(b) Total of 6 hours downtime for one end item.
(3) Time for repair/replacement --
(a) Total of 30 man-hours using 5 persons.
(b) Total of 6 hours downtime for one end item.
4