TB 1--1520--238--20--121
10. Supply/Parts and Disposition.
a.
Parts Required.
NOMENCLATURE
PART NUMBER
NATIONAL STOCK NUMBER
Cord Detonating
51135--7
1377--01--186--9901
Cord Detonating
7--311112017--35
1377--01--186--9901
b. Requisitioning Instructions. Requisition replacement parts through normal supply channels using
normal supply procedures. All requisitions shall use project code (CC 57--59) "X15" (X--Ray one five).
NOTE
Project code "X15" is required to track and establish a data base of stock fund
expenditures incurred by the field as a result of TB actions.
c.
Bulk and Consumable Materials. N/A.
NOMENCLATURE
PART NUMBER
NATIONAL STOCK NUMBER
Wire Non Electrical 1 lb. 0.032
MS20995NC32
9525--00--255--6072
in. Nickel
O--Ring
M83248/2--903
5331--01--011--4057
d. Disposition. Dispose of removed parts/components IAW TM 1--1520--238--23, page 1--417, para-
graph 1.139h or the IETM, AH--64D General Information, Appendices, Cartridge and Propellant Actuated
Devices.
e. Disposition of Hazardous Material. IAW Environmental Protection Agency Directives as implement-
ed by your servicing environmental coordinator (AR 200--1).
11. Special Tools, Jigs and Fixtures Required. N/A.
a.
Category of Maintenance. AVUM. Aircraft downtime will be charged to AVUM.
b.
Estimated Time Required.
(1) Time to complete inspection. Total of 3.0 man--hours using 1 person.
(2) Time to replace detonating cord.
(a) Total of 10.0 man-hours using 2 people.
(b) Total of 5.0 hours downtime for one end item.
c.
Estimated Cost Impact of Stock Fund Items to the Field.
NOMENCLATURE
PART NUMBER/
QUANTITY
COST EACH
TOTAL $
NATIONAL STOCK NUMBER
Cord, Detonating
1377--01--186--9901
1
9.00
9.00
Maximum total cost per aircraft = 9.00
d.
TB/MWOs to be Applied Prior to or Concurrently with this Inspection. N/A.
e. Publications Which Require Change as a Result of This Inspection. A copy of this TB
1--1520--238--20--121 shall be inserted in the appropriate TM as authority to implement the change until the
printed change is received.
4