TB 1-1730-229-30-3
1.0
INTRODUCTION
1.1
Test Objective
To demonstrate that an AGPU is physically and functionally operational and document end item
final inspection and acceptance by the Government.
1.2
Test Purpose
To determine that the RESET AGPU was properly repaired; that inherent safety devices are
correctly installed and operate as required; that the AC/DC electrical system is operational; and
that the unit will deliver electrical power, hydraulic, and pneumatics power as required.
1.3
Test Performance Sequence
The procedures included in the following Acceptance Test need not be accomplished in number
sequence except where the sequence is required for safety or operational purposes.
2.0
TEST REQUIREMENTS
2.1
Test Specimen
AGPU Model #: MEP-360A or D (circle one)
AGPU S/N:
Starting GTE Hour Meter:
Final GTE Hour Meter reading:
Starting Hydraulic Module Hour Meter:
Final Hydraulic Module Hour Meter reading:
2.1.1
83-360A/D AGPU unit complete with battery and service lines slaved
2.2
Test Equipment
a. DC load bank, adjustable, 100 and 350 Amps at 28 VDC
b. AC load bank, adjustable, 20 KW, 40 KW, 55 KW, and 70 KW
c.
PNEUMATIC load test stand
d. Multi-meter, capable of measuring true RMS and amperage
e. 24 VDC battery load tester
21